Thursday 5 March 2009

A day at a factory





Two factory units, 5 locations, 2 Canon cameras, 3 lenses, 1 Tripod, 6 Bowens flash-heads with stands etc, 2 extension cables, 1 travel pak battery, 5 cases and no assistant. Sounds like murder, well no, not this time, when the client helps out everything goes really well. At the end of the day we had the required shots plus a good library of extra shots too. These big cavernous factory units are usually a little on the dark side, so you need to pour some light into them, or as with some of the shots, not, just to give a bit more drama. The clients happy and better still there's now more to do at another of their sites.


No comments: